Near Miss Case Study: Predict Phantom Hazards to Optimize Fall Protection Equipment

2022-06-18 21:34:35 By : Mr. Robert Wang

Practical EHS Tips, News & Advice. Updated Daily.

An unprecedented near miss is a once-in-a-work-life occurrence for most. Although they aren’t positive experiences, they should always be used as a positive learning opportunity to eliminate future risk; the incident described within should not be treated any differently. “It’s always good to share these types of incidents. Hearing about others’ experiences provides insight and knowledge to keep you aware of your surroundings,” adds Isaiah Robinson, Lead Man at D. C. Taylor Co. in Cedar Rapids, Iowa.

A warehouse storage company recognized the need for a reroofing project at its Muscatine, Iowa, warehouse. The project entailed replacing the existing roof system (ballasted EPDM over a built-up roof) with new insulation and a TPO membrane. The building owner had already identified areas of the roof where the deck needed to be replaced once the roof was removed. The owner contracted with Cedar Rapids-based commercial/industrial roofing contractor D. C. Taylor Co.

The project would be completed in two stages: a partial roof deck replacement in December 2020 and the remainder of the roof getting torn off and new insulation and membrane being laid the following spring.

Once the pea gravel was removed from the roof, three individuals from D. C. Taylor Co. completed a thorough prejob deck inspection. The Vice President—Service, a service project supervisor, and a service technician conducted the visual inspection. The structural integrity of the precast concrete deck panel was determined by examining both the surface of the roof deck (once the roof materials were removed) and the underside (from the building interior) for cracks, spalling, etc. The three men agreed that, aside from the areas already set for deck replacement, the roof deck appeared to be in good condition.

The fall protection plan was reviewed, and the crew donned appropriate personal protective equipment (PPE). In addition to the personal equipment, the safety setup included:

Each crew member on this project had received all required Occupational Safety and Health Administration (OSHA) safety training. Additionally, the project supervisor and project manager had OSHA 30 Hour and Personal Fall Arrest System (PFAS) Competent Person training (including rescue).

The men connected their 33-ft leading edge self-retracting lifelines (SRLs) before entering the controlled access zone. All lifelines were connected to a mobile anchor cart 17 ft from the edge of the deck replacement area. All safety precautions complied with OSHA regulations and D. C. Taylor Co.’s PPE Guide and deck replacement policy requirements.

The three-man crew demolished two areas of precast concrete deck panels totaling 740 square feet (sq ft) and replaced it with new, conventional 22-guage, type B steel decking. While the remainder of their work on this project did not necessitate the same level of fall protection, the crew remained in fall arrest.

One of the crew members was walking to the deck replacement area when a section of concrete deck that was previously inspected and deemed stable broke in two. The roofer fell through the collapsed roof area. The mobile anchor cart claw engaged, but his SRL did not engage its brake and slowly lowered him 12 ft–15 ft to the interior level. Thankfully, there was no machinery or processes below; the height didn’t require a rescue.

He was uninjured, surprised, and grateful for the slow descent; however, the SRL should have stopped his fall entirely. The SRL’s shock pack did not engage, and the impact indicator on the harness was still intact. After inspecting the equipment, there was no indication of an impact at all. “With no visible signs like cracks or holes in the concrete, my main reaction was just shock. After falling, I was still in shock and thinking, ‘That is definitely not right. How did that happen?’” recalls Robinson.

When the roofer fell, the cable snapped to the left, directly in line with the mobile anchor cart positioned 17 ft away from the edge. Once the cable became taught, in line with the cart, it set the claw and wedged the SRL cable into a new crack on the edge of the remaining concrete panel that created a jagged pitch point. This slowed the speed of the cable, prohibiting the locking mechanism (activated by centrifugal force) from engaging and completely stopping the fall. In this specific near miss scenario, there was no negative impact because there was no hazard below the worker, but in many other circumstances, this could have had a much worse outcome.

By assessing the equipment used, work practices, and sense of security, we can identify how this event could have been prevented or the hazard eliminated. As previously stated, although a reliable fall arrest system was deployed, with no indicators of potential risk, many phantom hazards existed. The following are some of the appropriate alternatives and the hazard they’re intended to protect against:

D. C. Taylor Co. will continue to implement fall arrest for most deck replacement projects but will look for opportunities to work in fall restraint and off the floating decks when able.

The commercial/industrial roofing contractor will implement, where applicable, the use of floating decks to prevent breakthrough of suspected deck systems, especially precast concrete and plywood roof decks. A floating deck is typically 20- to 22-gauge metal that is supported by and secured to the deck and structural members to provide a safe walking-working surface.

Additionally, the fall protection plan, whenever relevant, will require that crews pay closer attention to purlin direction on the underlying structure; this relates to cable impact with a solid surface and stopping the SRL if a breakthrough happens.

D. C. Taylor Co. is consistent in maintaining a good rescue plan on every jobsite. Rescue options, job location, and important emergency phone numbers are identified, discussed, and documented before every job start. Project supervisors and leads are trained in competent person rescue, and all personnel are equipped with and trained to use trauma straps for self-rescue. Additionally, each crew trains on (and carries) an 18-ft rescue pole, with carabiner and tagline, as well as a rescue ladder. In the incident described here, rescue was not required; however, D. C. Taylor Co. is always prepared in case it is.

Brent Taylor is President of the D. C. Taylor Co. roofing company, based in Cedar Rapids, Iowa.

The Hazard Communication Standard (HCS) requires pictograms on labels to alert users of the chemical hazards to which they may be exposed. Each pictogram consists of a symbol on a white background framed within a red border and represents a distinct hazard(s). The pictogram on the label is determined by the chemical hazard classification.

Do your employees know how to handle hazardous materials safely? Here are 11 basic rules all employees who handle hazardous materials should know and follow.

Why reinvent the wheel when there are so many ready-made safety observances to link up to? The National Safety Council (NSC) publishes an annual list of safety meeting topics. Here are some highlights.

The State of Safety and Beyond Survey gathered the insight of 314 environment, health, and safety (EHS) professionals about how their organizations are dealing with current safety challenges and what they’re expecting in the future. These concerns run the gamut from the very real threat of COVID-19 to perennial issues such as training, leadership, safety […]

While we hope that fire extinguishers never have to be used, they still need to be inspected and maintained to ensure they are working properly in case an emergency occurs. In the Sure-Fire Guide to Fire Extinguisher Inspections, you will: Learn how often fire extinguishers should be inspected. Get a paper copy of KPA’s Monthly […]

Industry standards help set the foundation for a safety management system (SMS) that protects workers, but data gathering is the engine that drives it. The Intelex Insight Report “Safety Management Systems: Building a Foundation on Data,” explains what resources are available to help you create a system and identifies key SMS data-gathering components needed. Learn […]

Using the right tool to complete a task or project makes all the difference. For example, contractors wouldn’t use a drill to push in a nail, they’d use a hammer. The same holds true when it comes to general medical record documentation vs employee and occupational health recordkeeping. General healthcare practitioners focus their work on […]

Are you an environment, health, and safety (EHS) professional with something to contribute to your professional community? If so, we want to hear from you! As we build the EHS Daily Advisor community, we are looking for professionals, managers, and executives to be a part of our Faces of EHS profile series as well as contribute thoughtful content that can help our colleagues in the field with their compliance and cultural efforts. Learn more!

The mission of EHS On Tap is to provide clear, relevant, actionable information on topics that matter to EHS professionals in podcast form through engaging and insightful interviews with experts and thought leaders. Listen to the latest and subscribe!